Page 1 of 1

Change in examination deadlines

Posted: Sun Dec 22, 2024 8:55 am
by thouhidul32
On the other hand, if the customer is not interested in a detailed immersion in the project and does not require the inclusion of complex information models in the work, it is possible to minimize the requirements and avoid unnecessary work.

Alexander Osipov added that technical committees have long been developing the idea germany phone number list of ​​automating digital model verification. However, the expert bodies will be ready for this only in 10-20 years. And although the Moscow Expertise conducted experiments with automatic model verification back in 2017, the initiative was not successful due to the lack of necessary software, methodology and specialists.

Then the expert referred to Sergey Dragomirov's words about changes in legislation and once again confirmed that some regulatory documents should be looked at closely, as they are mandatory for execution. However, they do not need to be spelled out in detail in the technical specifications: this adds extra work to both designers and employees of the expert bodies.

Image

The last question to the experts concerned the possibility of extending the time frame for the examination.

Sergey Dragomirov explained that there are no plans to increase the timeframes for examination of BIM models at the state level. At the moment, Government Resolution No. 145 is in effect, which describes the criteria for the timeframes for conducting examinations for objects depending on their functional purpose. At the same time, there is no regulatory legal act for changing them, and the state policy, on the contrary, is aimed at shortening the procedure. This is a challenge for developers and designers who are forced to adapt to the increased speed of work. Thus, specialists from the branch of the State Expertise in the Sverdlovsk Region have already drawn attention to the problem associated with insufficient time to check projects.

Alexander Osipov added that it would be better for designers not to think about increasing the timeframe for examination, but to focus on internal processes in their companies:

"Think about your own company, about your own salary. Because if you are asked to do more in a unit of time, it means that you will earn less. And your directors should remember this too."